How to Get Your Sidewalk Shed Down in Brooklyn Under the 90-Day Rule

By MLM Construction Group ยท Brooklyn, NY ยท Updated September 2026

NYC's "Get Sheds Down" laws cut sidewalk shed permits from two years to 90 days, and added penalties of roughly $5,000 to $20,000 for owners who keep a shed up without repairing the facade behind it. From permit issue you have about five months to file construction documents, eight months to pull the work permit, and two years to finish. MLM Construction Group does the parapet, cornice, lintel and pointing work that actually retires the shed, from our Brooklyn base โ€” call (516) 713-9199.

Why the Rule Changed

Sidewalk sheds were supposed to be temporary. They became permanent because they were cheaper than the repair. Put up the shed, satisfy the unsafe-condition requirement, and the pressure to actually fix the facade disappeared. Blocks across Brooklyn have lived under scaffolding for years.

The new framework removes the incentive. A short permit, renewals that require evidence of progress, and penalties large enough that stalling is no longer the cheap option.

The Clock, in Order

MilestoneDeadlineWhat it means
Shed permit90 daysDown from two years; renewable with evidence of progress
Construction documents filed~5 months from permitYour engineer's drawings for the repair
Work permit pulled~8 months from permitThe job is actually authorized to start
Repair complete, shed removed2 yearsAmended report filed, public protection released

What Actually Has to Be Fixed

On a Brooklyn row house or small apartment building, the conditions that put a shed up are almost never the middle of the wall. They are at the top and at the openings:

The order of operations that works

Read the actual cited conditions in the engineer's report, not the summary. Get the scope priced as a whole rather than condition by condition โ€” once access is paid for, doing the full top of the building is usually cheaper per unit than three separate mobilizations. Book masonry for weather, because mortar and freeze-thaw do not negotiate. And schedule the engineer's re-inspection before the work finishes; the amended filing is what releases the shed, and waiting to book it is where most owners lose a month.

The Math Owners Get Wrong

The instinct is to minimize the repair scope and keep the shed a little longer. Run the arithmetic instead. Take your monthly shed rental, multiply by the months you realistically need, and add the penalty exposure. Then compare that to the difference between the minimum patch scope and doing the parapet and cornice properly once.

In most cases we price in Brooklyn, the full repair wins โ€” and it also resets your position for the next facade cycle instead of buying eighteen months.

Get the shed down. We'll price the whole thing.

MLM Construction Group has worked on Brooklyn parapets, cornices, lintels and brick since 2009 โ€” BBB A+ accredited, Google Guaranteed, HIC #2130570. We'll walk the conditions in your engineer's report, price the real scope, and coordinate so the amended filing is ready when the wall is. Call (516) 713-9199 or request a free estimate.

Frequently Asked Questions

How long can a sidewalk shed stay up in NYC now?

A new sidewalk shed permit runs 90 days rather than the two years allowed under the old rules. It can be renewed, but the Department of Buildings now expects to see the facade repair progressing: construction documents on file within roughly five months of the original permit, a work permit within about eight months, and the repair complete within two years.

What are the penalties for keeping a shed up without doing the work?

Owners who leave a shed standing without advancing the facade repair face penalties in the range of $5,000 to $20,000. These are separate from FISP facade penalties, which start around $1,000 to $5,000 and add roughly $250 per month past a missed filing deadline, so the two can run at the same time.

How much does a sidewalk shed cost per month in Brooklyn?

Shed rental is generally priced per linear foot per month, and on a typical Brooklyn row-house frontage owners commonly pay several hundred to a few thousand dollars a month once installation is amortized. Over a multi-year shed, the rental alone often exceeds the cost of the repair the shed was protecting the public from.

What repairs are usually needed before a shed can come down?

On Brooklyn row houses it is almost always the top of the building: parapet rebuild or repointing, coping replacement, cornice repair or stabilization, lintel replacement where steel has rusted and cracked the brick, and repointing of spalled or open joints. The specific list comes from the conditions written up in your engineer's report.

Do the new shed fines stack on top of FISP penalties?

Yes. The shed penalties address leaving public protection in place without doing the work; the FISP penalties address the facade filing itself. They are enforced separately, which is why a stalled facade job gets expensive faster than most owners expect.

Can shed rental really cost more than the repair?

It frequently does. That is the whole logic behind the rule change. On long-standing sheds we have seen the accumulated rental approach or pass what the parapet and cornice work would have cost had it been done at the start.

A note on the dates above

These deadlines and penalty ranges reflect the current DOB framework, and facade rules in New York change. Confirm the specifics for your building with your engineer or on the NYC Department of Buildings site before planning around them.

โ† Back to all articles